Voltage Stasis Technologies, LLC
  • Home
  • Benefits And Features
  • How it Works...
  • Products
  • Who We Are.....
  • Contact Us

Robertson County Tennessee
Robertson County Tennessee had two separate Powerhouse units installed on two separate distribution panels. This graph shows the savings after only 1 month of use.

Picture
_Robertson County Tennessee monitored 2 of their pumps which showed a dramatic decrease in pump temperatures which will add longevity to the pumps operational life span and reduction in maintenance.

Picture
Robertson County Tennessee tested the voltage between phases on one of their 20 ton HVAC units which showed an 11% phase imbalance. Once THE POWERHOUSE Unit was installed it balanced out to .6%.

Picture
Site powered by Weebly. Managed by HostGator